forked from forks/qmk_firmware
181 lines
14 KiB
Markdown
181 lines
14 KiB
Markdown
# Breaking Changes
|
|
|
|
This document describes QMK's Breaking Change process. A Breaking Change is any change which modifies how QMK behaves in a way that in incompatible or potentially dangerous. We limit these changes so that users can have confidence that updating their QMK tree will not break their keymaps.
|
|
|
|
This also includes any keyboard moves within the repository.
|
|
|
|
The breaking change period is when we will merge PRs that change QMK in dangerous or unexpected ways. There is a built-in period of testing so we are confident that any problems caused are rare or unable to be predicted.
|
|
|
|
Practically, this means QMK merges the `develop` branch into the `master` branch on a 3-month cadence.
|
|
|
|
## What has been included in past Breaking Changes?
|
|
|
|
* [2024 May 26](ChangeLog/20240526)
|
|
* [2024 Feb 25](ChangeLog/20240225)
|
|
* [2023 Nov 26](ChangeLog/20231126)
|
|
* [Older Breaking Changes](breaking_changes_history)
|
|
|
|
## When is the next Breaking Change?
|
|
|
|
The next Breaking Change is scheduled for August 25, 2024.
|
|
|
|
### Important Dates
|
|
|
|
* 2024 May 26 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions.
|
|
* 2024 Jul 28 - `develop` closed to new PRs.
|
|
* 2024 Jul 28 - Call for testers.
|
|
* 2024 Aug 4 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes
|
|
* 2024 Aug 18 - `develop` is locked, only critical bugfix PRs merged.
|
|
* 2024 Aug 22 - `master` is locked, no PRs merged.
|
|
* 2024 Aug 25 - Merge `develop` to `master`.
|
|
* 2024 Aug 25 - `master` is unlocked. PRs can be merged again.
|
|
|
|
## What changes will be included?
|
|
|
|
To see a list of breaking changes merge candidates you can look at the [`core` label](https://github.com/qmk/qmk_firmware/pulls?q=is%3Aopen+label%3Acore+is%3Apr). This label is applied whenever a PR is raised or changed, but only if the PR includes changes to core areas of QMK Firmware. A PR with that label applied is not guaranteed to be merged in the current cycle. New changes might be added between now and when `develop` is closed, and it is generally the responsibility of the submitter to handle conflicts. There is also another label used by QMK Collaborators -- `breaking_change_YYYYqN` -- which signifies to maintainers that it is a strong candidate for inclusion, and should be prioritized for review.
|
|
|
|
If you want your breaking change to be included in this round you need to create a PR and have it accepted by QMK Collaborators before `develop` closes. After `develop` closes, new submissions will be deferred to the next breaking changes cycle.
|
|
|
|
The simpler your PR is, the easier it is for maintainers to review, thus a higher likelihood of a faster merge. Large PRs tend to require a lot of attention, refactoring, and back-and-forth with subsequent reviews -- with other PRs getting merged in the meantime larger unmerged PRs are far more likely to be susceptible to conflicts.
|
|
|
|
Criteria for acceptance:
|
|
|
|
* The PR is complete and ready to merge
|
|
* GitHub checks for the PR are green whenever possible
|
|
* A "red" check may be disregarded by maintainers if the items flagged are unrelated to the change proposed in the PR
|
|
* Modifications to existing files should not need to add license headers to pass lint, for instance.
|
|
* If it's not directly related to your PR's functionality, prefer avoiding making a change.
|
|
|
|
Strongly suggested:
|
|
|
|
* The PR has a ChangeLog file describing the changes under `<qmk_firmware>/docs/Changelog/20240526`.
|
|
* This should be in Markdown format, with a name in the format `PR12345.md`, substituting the digits for your PRs ID.
|
|
* One strong recommendation that the ChangeLog document matches the PR description on GitHub, so as to ensure traceability.
|
|
|
|
## Checklists
|
|
|
|
This section documents various processes we use when running the Breaking Changes process.
|
|
|
|
### 4 Weeks Before Merge
|
|
|
|
* `develop` is now closed to new PRs, only fixes for current PRs may be merged
|
|
* Post call for testers: message `@Breaking Changes Updates` on `#qmk_firmware` in Discord:
|
|
* `@Breaking Changes Updates -- Hey folks, last day for functional PRs to be raised against qmk_firmware for this breaking changes cycle is today.`
|
|
|
|
### 2 Weeks Before Merge
|
|
|
|
* `develop` is now closed to existing PR merges, only bugfixes for previous merges may be included
|
|
* Post call for testers: message `@Breaking Changes Updates` on `#qmk_firmware` in Discord.
|
|
* `@Breaking Changes Updates -- Hey folks, last day for functional PRs to be merged into qmk_firmware for this breaking changes cycle is today. After that, we're handling bugfixes only.`
|
|
|
|
### 1 Week Before Merge
|
|
|
|
* `develop` is now closed to PR merges, only critical bugfixes may be included
|
|
* Announce that master will be closed from `<2 Days Before>` to `<Day of Merge>` -- message `@Breaking Changes Updates` on `#qmk_firmware` in Discord:
|
|
* `@Breaking Changes Updates -- Hey folks, last day for functional PRs to be merged into qmk_firmware for this breaking changes cycle is today. After that, we're handling bugfixes only.`
|
|
|
|
### 2 Days Before Merge
|
|
|
|
* `master` is now closed to PR merges
|
|
* Announce that master is closed for 2 days
|
|
* `@Breaking Changes Updates -- Hey folks, the master branch of qmk_firmware is now locked for the next couple of days while we prepare to merge the newest batch of changes from develop.`
|
|
|
|
### Day Of Merge
|
|
|
|
* `qmk_firmware` git commands
|
|
* `git checkout develop`
|
|
* `git pull --ff-only`
|
|
* Edit `readme.md`
|
|
* Remove the notes about `develop`
|
|
* Roll up the ChangeLog into one file.
|
|
* `git commit -m 'Merge point for <DATE> Breaking Change'`
|
|
* `git push upstream develop`
|
|
* GitHub Actions
|
|
* Create a PR for `develop`
|
|
* **Turn off 'Automatically delete head branches' for the repository** -- confirm with @qmk/directors that it is done before continuing
|
|
* `qmk_firmware` git commands
|
|
* `git checkout master`
|
|
* `git pull --ff-only`
|
|
* `git merge --no-ff develop`
|
|
* `git tag <next_version>` # Prevent the breakpoint tag from confusing version incrementing
|
|
* `git push upstream <next_version>`
|
|
* `git push upstream master`
|
|
|
|
## Post-merge operations
|
|
|
|
### Updating the `develop` branch
|
|
|
|
This happens immediately after the previous `develop` branch is merged to `master`.
|
|
|
|
* `qmk_firmware` git commands
|
|
* `git checkout master`
|
|
* `git pull --ff-only`
|
|
* `git checkout develop`
|
|
* `git pull --ff-only`
|
|
* `git merge --no-ff master`
|
|
* Edit `readme.md`
|
|
* Add a big notice at the top that this is a testing branch. See previous revisions of the `develop` branch.
|
|
* Include a link to this document
|
|
* `git commit -m 'Branch point for <DATE> Breaking Change'`
|
|
* `git tag breakpoint_<YYYY>_<MM>_<DD>`
|
|
* `git push upstream breakpoint_<YYYY>_<MM>_<DD>`
|
|
* `git push upstream develop`
|
|
|
|
* All submodules under `lib` now need to be checked against their QMK-based forks:
|
|
* `git submodule foreach git log -n1`
|
|
* Validate each submodule SHA1 matches the qmk fork, e.g. for ChibiOS:
|
|
* Go to [qmk/ChibiOS](https://github.com/qmk/ChibiOS)
|
|
* Compare the commit hash in the above output to the commit hash in the repository
|
|
* If there's a mismatch, that repository needs to have its `qmk-master` branch updated to match (otherwise Configurator won't work):
|
|
* `cd lib/chibios`
|
|
* `git fetch --all`
|
|
* `git checkout qmk-master`
|
|
* `git reset --hard <commit hash>`
|
|
* `git push origin qmk-master --force-with-lease`
|
|
|
|
* Announce that both `master` and `develop` are now unlocked -- message `@Breaking Changes Updates` on `#qmk_firmware` in Discord:
|
|
* `@Breaking Changes Updates -- Hey folks, develop has now been merged into master -- newest batch of changes are now available for everyone to use!`
|
|
|
|
* (Optional) [update ChibiOS + ChibiOS-Contrib on `develop`](chibios_upgrade_instructions)
|
|
|
|
|
|
### Set up Discord events for the next cycle
|
|
|
|
* Update this file with the new dates: `docs/breaking_changes.md`
|
|
* Create Events on the QMK Discord - "Somewhere Else" => "GitHub":
|
|
* Event #1:
|
|
| Field | Value |
|
|
|-------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
|
|
| Topic | Last `develop` functionality PRs to be raised |
|
|
| Start Date | ((5 weeks before merge)), 12:00am |
|
|
| End Date | ((4 weeks before merge)), 12:00am |
|
|
| Description | This is the last window for functional PRs to be raised against `develop` for the current breaking changes cycle. After ((4 weeks before merge)), any new PRs targeting `develop` will be deferred to the next cycle. |
|
|
* Event #2:
|
|
| Field | Value |
|
|
|-------------|------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
|
|
| Topic | Last `develop` functionality PRs to be merged |
|
|
| Start Date | ((4 weeks before merge)), 12:00am |
|
|
| End Date | ((2 weeks before merge)), 12:00am |
|
|
| Description | This is the last window for functional PRs to be merged into `develop` for the current breaking changes cycle. After ((2 weeks before merge)), only bugfix PRs targeting `develop` will be considered for merge. |
|
|
* Event #3:
|
|
| Field | Value |
|
|
|-------------|---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
|
|
| Topic | `develop` closed for merges |
|
|
| Start Date | ((2 weeks before merge)), 12:00am |
|
|
| End Date | ((day of merge)), 12:00am |
|
|
| Description | This is the deadline for functionality bugfix PRs to be merged into `develop` for the current breaking changes cycle. After ((1 week before merge)), only critical bugfix PRs targeting `develop` will be considered for merge. |
|
|
* Event #4:
|
|
| Field | Value |
|
|
|-------------|----------------------------------------------------------------------------------------------------------------------|
|
|
| Topic | `master` closed for merges |
|
|
| Start Date | ((2 days before merge)), 12:00am |
|
|
| End Date | ((day of merge)), 12:00am |
|
|
| Description | This is the period that no PRs are to be merged to `master`, so that the merge of `develop` into `master` is stable. |
|
|
* Event #5:
|
|
| Field | Value |
|
|
|-------------|--------------------------------------------------------------------------------------------------------------------------------------------|
|
|
| Topic | `develop` merges to `master` |
|
|
| Start Date | ((day of merge)), 12:00am |
|
|
| End Date | ((day of merge)), 11:45pm |
|
|
| Description | At some point, QMK will merge `develop` into `master` and everyone will be able to reap the benefits of the newest batch of functionality. |
|