fix: give the kids' bathroom enough preheat to reach its setpoint #16

Merged
varl merged 1 commit from runa/hass:fix/kids-preheat-leads into main 2026-11-15 12:15:04 +01:00
Member

On #15's leads the kids' room came up short. At window start, 13-15 Nov (outdoor 0.6-4 °C):

target reached
06:30 (lead 60) 22 20.6, 20.7, 21.1
18:00 (lead 90) 21 20.4, 21.1

The floor lifts the air ~0.5 °C/h, less on a cold night. Morning lead 60 -> 150: its preheat runs in the cheap night (~4.3 SEK/kWh 9-12 Nov). Evening 90 -> 120: one more half hour at peak, about 0.25 kWh. just check-local passes.

On #15's leads the kids' room came up short. At window start, 13-15 Nov (outdoor 0.6-4 °C): | | target | reached | |---|---|---| | 06:30 (lead 60) | 22 | 20.6, 20.7, 21.1 | | 18:00 (lead 90) | 21 | 20.4, 21.1 | The floor lifts the air ~0.5 °C/h, less on a cold night. Morning lead 60 -> 150: its preheat runs in the cheap night (~4.3 SEK/kWh 9-12 Nov). Evening 90 -> 120: one more half hour at peak, about 0.25 kWh. `just check-local` passes.
fix: give the kids' bathroom enough preheat to reach its setpoint
Some checks are pending
ci/woodpecker/pr/check Pipeline is pending approval
ci/woodpecker/push/check Pipeline was successful
ci/woodpecker/push/deploy Pipeline was successful
98cf397088
On the 60 and 90 min leads from #15 the room reached 20.6-21.1 of 22 at
06:30 on all three mornings, and 20.4 and 21.1 of 21 at 18:00, at outdoor
0.6-4 °C. Morning 150 min (its preheat runs in the cheap night), evening 120.
varl merged commit 98cf397088 into main 2026-11-15 12:15:04 +01:00
varl deleted branch fix/kids-preheat-leads 2026-11-15 12:15:04 +01:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
meatbag/hass!16
No description provided.